Main Projects
- Top-Up Operation
- Beam Orbit Stabilization in Storage Ring
- Emittance Reduction of Storage Ring
- Introduction of Long Straight Sections and Stability of Ring with Low-Periodicity
- Generation of Highly Purified Single-Bunch Beam
- Development of Bunch-by-Bunch Feedback System
- Development of RF Gun
- Generation of Femto-Second X-ray Pulse by Bunch Rotation
- MeV-γ Generation by Compton Backward Scattering
- MeV-γ Generation by Superconducting Wiggler
Last modified
2010-11-18 17:31