Outline of Experimental Drainage Treatment Facility
(1) Treatment of experimental drainage
- Treatment capacity 250 m3/day
- Treatment process
raw water control → coagulation - precipitation with agent addition → filtration through sand / activated carbon → chelation treatment for mercury and heavy metal removal
Discharged into sewerage after confirmation that analyzed values are under Effluent Standards.
*Effluent Standards : standards are specified by Harima-Kogen Wide-Area Union (based on Water Pollution Control Law.)
(2) Automatic analyzer equipment of water quality
- Raw water autoanalyzer
To protect the facility, autoanalyzers are installed to detect the raw water that doesn't fit acceptance criteria.
Analyzer
Fluoride ion, Total-chromium, Total-cyanogen, Mercury, Oils, Phenol, Manganese - Treated water autoanalyzer
Twelve analyzers are currently in operation.
Analyzer
Cadmium, Cyanogen, Hexavalent chromium, Arsenic, Lead, Fluoride ion, Total-chromium, Total-cyanogen, Mercury, Oils, Phenol, Manganese
Last modified
2011-09-01 14:14