SPring-8, the large synchrotron radiation facility

Skip to content
» JAPANESE
Personal tools
 

Beamline Map

| Beamline List | History | Beamline Map (PDF) |


Beamline_map BL23SU BL24XU BL25SU BL26B1 BL26B2 BL27SU BL28B2 BL28XU BL29XU BL31LEP BL32XU BL33XU BL33LEP BL35XU BL37XU BL39XU BL40XU BL40B2 BL41XU BL43IR BL43LXU BL44XU BL44B2 BL46XU BL45XU BL47XU BL22XU BL20B2 BL20XU BL19B2 BL19LXU BL17SU BL16B2 BL16XU BL15XU BL14B1 BL14B2 BL13XU BL12B2 BL12XU BL11XU BL09XU BL10XU BL08B2 BL08W BL07LSU BL05XU BL04B2 BL04B1 BL03XU BL02B2 BL02B1 BL01B1

Note: the PDF Beamline Mappdf is better to print and to see more detail on an enlarged scale.

History

April 1, 2020: Beamline Names Changed.

  • BL44B2 RIKEN Materials Science
    → BL44B2 RIKEN Materials Science I
  • BL36XU Catalytic Reaction Dynamics for Fuel Cells ( The University of Electro-Communications )
    → BL36XU RIKEN Materials Science II

April 1, 2019: Beamline Names Changed.

  • BL05XU RIKEN Diagnosis Beamline I
    → R&D-ID
  • BL32B2 RIKEN
    → R&D-BM
  • BL38B1 Structural Biology III
    → RIKEN Structural Biology I
  • BL38B2 RIKEN Diagnosis Beamline II
    → Diagnosis Beamline
  • BL45XU RIKEN Structural Biology I
    → Structural Biology III

April 23, 2018: Beamline status changed.

  • BL32B2 RIKEN: Planned or Under Construction
    → Operational

April 1, 2017: Beamline Names Changed.

April 1, 2016: Beamline Names Changed.

February 1, 2016: Beamline Names Changed.

October 3, 2013: Contract Beamline Became Operational.

January 17, 2013: Contract Beamline Became Operational.

April 3, 2012: Contract Beamline Became Operational.

April 1, 2012: Contract Beamline BL32B2 Became RIKEN Beamline.

  • BL32B2: Pharmaceutical Industry → RIKEN

April 1, 2012: RIKEN Beamline Became Operational.

March 1, 2012: Contract Beamline Name Changed.

  • BL28XU: Advanced Basic Science for Battery Innovation (ABSBI) → RISING

January 18, 2012: Contract Beamline Contractor Name and Its Beamline Names Changed.

  • Contractor Name: Industrial Consortium → SUNBEAM Consortium
  • BL16B2: Sunbeam BM → SUNBEAM BM
  • BL16XU: Sunbeam ID  → SUNBEAM ID

July 22, 2011: Beamline Name Changed.

August 9, 2010: New Contract Beamline Added.

June 2, 2010: New Contract Beamline Added.

May 17, 2010: BL32XU RIKEN Targeted Proteins Beamline became operational.

April 1, 2010: Contract Beamline Names Changed.

November 11, 2009: The following two contract beamlines became operational.

October 21, 2009: New Contract Beamline Added.

May 15, 2009: BL33XU TOYOTA Beamline Started Operation.

May 8, 2009: Beamline Name Changed.

March 3, 2009: New RIKEN Beamline Added.

March 3, 2009: Official Beamline Name Approved.

August 28, 2008: Beamline Names Changed.

August 28, 2008: Source Category Changed.

  • BL43IR: Others → Bending Magnet

January 7, 2008: The beamline map was rotated 180 degrees.

January 7, 2008: The following four beamlines (three contract beamlines and one RIKEN beamline) were added to the beamline map.

  • BL03XU: Frontier Soft Matter (contract beamline)
  • BL07LSU: Univ-of-Tokyo (contract beamline)
  • BL32XU: RIKEN Targeted Proteins (RIKEN beamline)
  • BL33XU: TOYOTA (contract beamline)

October 30, 2007: The beamline name of BL46XU was changed from R&D to Engineering Science Research III

September 10, 2007: A public beamline, BL14B2 Engineering Science Research II, became available, and currently 49 beamlines are operational.

April 28, 2006: A public beamline, BL14B2 Engineering Science Research II, was added to the map.

October 25, 2005: The names of JAEA Contract Beamlines were changed.

  • BL11XU: JAEA Quantum Dynamics (former Materials Science II)
  • BL14B1: JAEA Materials Science (former Materials Science I)
  • BL22XU: JAEA Quantum Structural Science (former Actinide Science II)
  • BL23SU: JAEA Actinide Science (former Actinide Science I)

October 1, 2005: JAERI beamlines were categorized as contract beamlines.

September 22, 2005: RIKEN Coherent Soft X-ray Spectroscopy, BL17SU, became available.

September 1, 2005: Hyogo BM, BL08B2, became available.

May 1, 2005: The three beamline names were changed.

April 1, 2004: A contract beamline, BL08B2 Hyogo BM, was added to the beamline map.

  • The beamline name of BL24XU was changed from "Hyogo" to "Hyogo ID". The total number of SPring-8's beamlines is 48.

March 11, 2004: The Accelerator Beam Diagnosis Line BL05SS became operational and forty-six beamlines are in operation.

August 5, 2003: The names of Taiwan Beamlines were changed.

  • BL12XU: NSRRC ID
  • BL12B2: NSRRC BM
    (NSRRC: National Synchrotron Radiation Research Center)

June 18, 2003: Forty-five beamlines are operational.

May 7, 2003: The three beamline names were changed.

  • BL02B1: Single Crystal Structure Analysis
  • BL04B1: High Temperature and High Pressure Research
  • BL10XU: High Pressure Research
Last modified 2020-04-01 13:43